Matters needing attention in maintenance of buried domestic sewage treatment equipment

2026-11-11  From: Weifang Boxiang Machinery Equipment Co., Ltd. Browsing times:5

After using the buried sewage treatment equipment, it is necessary to carry out daily maintenance and fault repair. The following small series will talk about the maintenance precautions of buried domestic sewage treatment equipment.

1. The PH value of sewage entering the geographical sewage treatment equipment is necessary to be between 6 and 9, and the acidity and alkalinity will affect the normal growth of biofilm;

Second, it is necessary to pay attention to the fact that no large solid matter can enter the equipment in the sewage, so as not to block the pipeline and orifice and damage the pump;

Third, the fan generally needs to change the oil once after running for about 6 months to improve the service life of the fan;

Fourth, it is necessary to cover the manhole of sewage treatment equipment to prevent accidents or falling into large solid substances.

Five, it is necessary to ensure that the air inlet of the fan of sewage treatment equipment is unblocked.

Refer to the device drawing for preparation. Check whether the import and export direction is correct during hoisting. The orientation and direction of the tank can't be misplaced, and it is necessary to keep the distance between them. After the product is hoisted in place, the levelness should be measured. If it is uneven, it should be adjusted to make it level. After hoisting in place, connect the pipes, inject clean water into the equipment, check whether there is any leakage in each pipe, connect the control line of the electric cabinet with the aerator and water pump, and connect the electric cabinet with the power supply. Pay attention to the rotation of the motor and fan when wiring, which is necessary to be in the same direction as indicated. After the backfill is completed, the dosing and disinfection equipment and electric control cabinet are installed on the ground. After the equipment installation is completed, it is necessary to first connect the water pipes and wires of the ground electrical equipment and dosing equipment at the buried equipment site.

Precautions for backfilling after completion of the plant: Before backfilling, the product shall be filled with water to 1/2 water level, and then backfilled. It is definitely not allowed to backfill sludge to prevent the product from floating up, and the backfill shall comply with the requirements of waterless backfilling. When backfilling the soil, it is necessary to fill both sides of the bottom of the product manually. When the filling is over 30-50cm, it is necessary to tamp it every 30cm until it is even with the top of the product. It is necessary to compact the backfill above the top of the product. If the product is located in a road section, vehicles are definitely not allowed to be rolled before the final treatment on the ground. When backfilling, it is necessary for the quality of backfill soil to conform to the acceptance standard of backfill soil, and it is definitely not allowed to use construction waste as backfill soil. It is necessary to remove sharp corners, stones and hard sundries in the soil. When backfilling, it is necessary to backfill evenly and avoid local violent impact. After the backfill soil reaches the requirements of the construction specification, build the imported connecting well (about 0.8-1m away from the pool body), pour the concrete floor after the bottom cushion layer is compacted, make a chute in the well, and strictly implement the engineering design elevation.

Contact

  • Contacter:

    Mr. Liu

    Hotline:

    15854445898

  • Email:

    15854445898@126.com

  • Address:

    Shandong province Weifang Weicheng district yuhe neighbourhood lebushan ecological economic development service center


Follow us